10. 07. 2025 - 2025_Ledce1

CTU portable rainfall simulator

Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Půdoochranky


dry

precipitation start: 10:39

#1793

cultivated fallow

Exp. plot:
#592
Zal.:
10.07.2025
Plot inclination [%]:
9.8%
delay till the surface runoff:
00:02:00
Precipitation intensity:
60.0 mm.h-1
Organic carbon soil sample
Not available
Bulk density soil sample
Not available
Soil texture sample
Not available
#6443

precipitation

#10355

set value

#6444

surface run-off

#10356

raw data

#10357

derived data

#6445

sediment load

#10358

raw data

#10359

derived data

#6449

soil moisture

volumetric moisture measurement with Fieldscout right before starting the simulation run

#10366

derived data

dry

very wet

precipitation start: 11:26

#1794

cultivated fallow

Exp. plot:
#592
Zal.:
10.07.2025
Plot inclination [%]:
9.8%
delay till the surface runoff:
00:00:30
Precipitation intensity:
60.0 mm.h-1
Organic carbon soil sample
Not available
Bulk density soil sample
Not available
Soil texture sample
Not available
#6446

precipitation

#10360

set value

#6447

surface run-off

#10361

raw data

#10362

derived data

#6448

sediment load

#10363

raw data

#10364

derived data

#6450

soil moisture

volumetric moisture measurement with Fieldscout right before starting the simulation run

#10368

derived data

very wet