CTU portable rainfall simulator
Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Půdoochranky
dry
precipitation start:
10:34
precipitation
precipitation intensity value set on the simulator
| time | rainfall intensity [mm.h-1] | Note |
|---|
surface run-off
primary surface runoff samples evaluation - volume of the sample and the time interval of sampling (sampling starts in given simulation relative time)
| time | time interval [s ] | surface runoff volume [l] | Note |
|---|
Derived from record(s) #10779
| time | flow rate [l.min-1] | Note |
|---|
sediment load
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #10779 #10781
| time | sediment flux [g.min-1] | Note |
|---|
dry
very wet
precipitation start:
11:42
precipitation
precipitation intensity value set on the simulator
| time | rainfall intensity [mm.h-1] | Note |
|---|
surface run-off
primary surface runoff samples evaluation - volume of the sample and the time interval of sampling (sampling starts in given simulation relative time)
| time | time interval [s ] | surface runoff volume [l] | Note |
|---|
Derived from record(s) #10784
| time | flow rate [l.min-1] | Note |
|---|
sediment load
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #10784 #10786
| time | sediment flux [g.min-1] | Note |
|---|