Jirkov - stable simulator
Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Svahy
dry
precipitation start:
14:29
Geotextile Biomac-c
- Exp. plot:
- #279
- Zal.:
- 02.05.2019
- Plot inclination [%]:
- 22%
- delay till the surface runoff:
- 00:03:00
- Precipitation intensity:
- 160.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
cultivated fallow
- Exp. plot:
- #280
- Zal.:
- 02.05.2019
- Plot inclination [%]:
- 22%
- delay till the surface runoff:
- 00:03:00
- Precipitation intensity:
- 160.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
precipitation
| time | rainfall intensity [mm.h-1] | Note |
|---|
dry
very wet
precipitation start:
12:20
Geotextile Biomac-c
- Exp. plot:
- #279
- Zal.:
- 02.05.2019
- Plot inclination [%]:
- 22%
- delay till the surface runoff:
- 00:00:00
- Precipitation intensity:
- 160.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
cultivated fallow
- Exp. plot:
- #280
- Zal.:
- 02.05.2019
- Plot inclination [%]:
- 22%
- delay till the surface runoff:
- 00:00:00
- Precipitation intensity:
- 160.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
surface run-off
Derived from record(s) #6735
| time | flow rate [l.min-1] | Note |
|---|
primary surface runoff samples evaluation - volume of the samle and the time interval of sampling
| time | time interval [s ] | surface runoff volume [l] | Note |
|---|
sediment load
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #6734 #6736
| time | sediment flux [g.min-1] | Note |
|---|
precipitation
| time | rainfall intensity [mm.h-1] | Note |
|---|
surface run-off
Derived from record(s) #6731
| time | flow rate [l.min-1] | Note |
|---|
primary surface runoff samples evaluation - volume of the samle and the time interval of sampling
| time | time interval [s ] | surface runoff volume [l] | Note |
|---|
sediment load
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #6730 #6732
| time | sediment flux [g.min-1] | Note |
|---|