CTU portable rainfall simulator
Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Glyfosáty Erosion-3D
dry
precipitation start:
12:09
- delay till the surface runoff:
- 00:03:00
- Precipitation intensity:
- 60.0 mm.h-1
- Initial moisture:
- 27.6 %V
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
soil moisture
time | plot X coordinate [m ] | plot Y coordinate [m ] | volumetric soil moisture [%V] | Note |
---|
time | volumetric soil moisture [%V] | Note |
---|
surface run-off
time | flow rate [l.min-1] | Note |
---|
sediment load
time | suspended solids concentration [g.l-1] | Note |
---|
time | flow rate [l.min-1] | Note |
---|
surface run-off velocity
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
precipitation
time | rainfall intensity [mm.h-1] | Note |
---|
precipitation
time | precipitation total [mm] | Note |
---|
Derived from record(s) #5530
time | precipitation total [mm] | Note |
---|