CTU portable rainfall simulator
Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Půdoochranky SOPLAS
dry
precipitation start:
00:05
cultivated fallow
Zal. : 05.10.2022 (Exp. plot #186 [úhor 2022 podzim])
- delay till the surface runoff:
- 00:05:00
- Precipitation intensity:
- 60.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
surface run-off
runoff measured with volumetric method in 2,5 minute step
time | flow rate [l.min-1] | Note |
---|
sediment load
lab results for samples collected during simulation run
collected samples were weighed, dried out and wieghed again, resulting sediment mass is related to the original volume of the sample
time | suspended solids concentration [g.l-1] | Note |
---|
Derived from record(s) #5277 #5278
total mass of suspended solids within timestep derived from measured flow rate and sediment concentration data
time | sediment delivery [kg] | Note |
---|
Derived from record(s) #5277 #5278
moving average
time | sediment delivery [kg] | Note |
---|
precipitation
time | rainfall intensity [mm.h-1] | Note |
---|
surface run-off velocity
surface runoff speed measured with colour tracer (Brilliant blue)
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
dry
very wet
precipitation start:
16:36
cultivated fallow
Zal. : 05.10.2022 (Exp. plot #186 [úhor 2022 podzim])
- delay till the surface runoff:
- 00:01:00
- Precipitation intensity:
- 60.0 mm.h-1
- Organic carbon soil sample
- Not available
- Bulk density soil sample
- Not available
- Soil texture sample
- Not available
surface run-off
runoff measured with volumetric method in 2,5 minute step
time | flow rate [l.min-1] | Note |
---|
sediment load
lab results for samples collected during simulation run
collected samples were weighed, dried out and wieghed again, resulting sediment mass is related to the original volume of the sample
time | suspended solids concentration [g.l-1] | Note |
---|
Derived from record(s) #5281 #5282
total mass of suspended solids within timestep derived from measured flow rate and sediment concentration data
time | sediment delivery [kg] | Note |
---|
Derived from record(s) #5281 #5282
moving average
time | sediment delivery [kg] | Note |
---|
precipitation
time | rainfall intensity [mm.h-1] | Note |
---|
surface run-off velocity
surface runoff speed measured with colour tracer (Brilliant blue)
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|
time | plot X coordinate [m ] | time interval [s] | Note |
---|