13. 07. 2021 - Řisuty

CTU portable rainfall simulator

Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Glyfosáty Erosion-3D


dry

precipitation start: 12:11

#581

green peas

Zal. : 01.03.2021 (Exp. plot #155 [V5])

delay till the surface runoff:
00:13:00
Precipitation intensity:
60.0 mm.h-1
Initial moisture:
21.8 %V
Organic carbon soil sample
127 (direct measurement)
Bulk density soil sample
127 (direct measurement)
Soil texture sample
Not available
#2510

soil moisture

#4668

derived data

#2979

surface run-off

runoff measured with volumetric method in 2,5 minute step

#4406

homogenised raw data

#4737

raw data

#2999

sediment load

lab results for samples collected during simulation run

#4407

raw data

#4408

derived data

#4409

edited data

#3485

precipitation

#5438

set value

dry

very wet

precipitation start: 13:09

#582

green peas

Zal. : 01.03.2021 (Exp. plot #155 [V5])

delay till the surface runoff:
00:00:30
Precipitation intensity:
60.0 mm.h-1
Initial moisture:
36.6 %V
Organic carbon soil sample
127 (direct measurement)
Bulk density soil sample
127 (direct measurement)
Soil texture sample
Not available
#2511

soil moisture

#4669

derived data

#2982

surface run-off

runoff measured with volumetric method in 2,5 minute step

#4410

homogenised raw data

#4738

raw data

#2990

sediment load

lab results for samples collected during simulation run

#4411

raw data

#4412

derived data

#4413

edited data

#3504

precipitation

#5459

set value

very wet