CTU portable rainfall simulator
Katedra hydromeliorací a krajinného inženýrství, Fakulta stavební ČVUT v Praze
Zdroj financování: Glyfosáty Erosion-3D
dry
precipitation start:
11:27
cultivated fallow
- Exp. plot:
- #154
- Zal.:
- 26.05.2021
- Plot inclination [%]:
- 9%
soil moisture
[0;0] is in top left corner (viewed from the bottom), X is width, Y lenght
| time | plot X coordinate [m ] | plot Y coordinate [m ] | volumetric soil moisture [%V] | Note |
|---|
Derived from record(s) #3586
average value from point measurements within the experimental plot
| time | volumetric soil moisture [%V] | Note |
|---|
sediment load
lab results for samples collected during simulation run
collected samples were weighed, dried out and wieghed again, resulting sediment mass is related to the original volume of the sample
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #4447 #4448
total mass of suspended solids within timestep derived from measured flow rate and sediment concentration data
| time | sediment delivery [kg] | Note |
|---|
Derived from record(s) #4447 #4448
values 00:12:00 and 00:24:30 interpolated
| time | sediment delivery [kg] | Note |
|---|
surface run-off velocity
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
precipitation
| time | rainfall intensity [mm.h-1] | Note |
|---|
dry
very wet
precipitation start:
12:14
cultivated fallow
- Exp. plot:
- #154
- Zal.:
- 26.05.2021
- Plot inclination [%]:
- 9%
soil moisture
[0;0] is in top left corner (viewed from the bottom), X is width, Y lenght
| time | plot X coordinate [m ] | plot Y coordinate [m ] | volumetric soil moisture [%V] | Note |
|---|
Derived from record(s) #3587
average value from point measurements within the experimental plot
| time | volumetric soil moisture [%V] | Note |
|---|
sediment load
lab results for samples collected during simulation run
collected samples were weighed, dried out and wieghed again, resulting sediment mass is related to the original volume of the sample
| time | suspended solids concentration [g.l-1] | Note |
|---|
Derived from record(s) #4451 #4452
total mass of suspended solids within timestep derived from measured flow rate and sediment concentration data
| time | sediment delivery [kg] | Note |
|---|
Derived from record(s) #4451 #4452
values 00:05:30 and 00:23:00 - 00:25:30 interpolated
| time | sediment delivery [kg] | Note |
|---|
surface run-off velocity
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
| time | plot X coordinate [m ] | time interval [s] | Note |
|---|
precipitation
| time | rainfall intensity [mm.h-1] | Note |
|---|